Skip to content
South Africa Electricity and water PPI release

South Africa Electricity and water PPI: 11.2% (April 2025)

South Africa Electricity and water PPI came in at 11.2 on May 29, 2025, compared with 10 previously. See the full release history, chart, South African Reserve Bank context, and API access for this series.

Released: · 2025-05-29 09:30 UTC

Actual
11.2

April 2025

Previous
10
Forecast
--
Next release
--
Related South Africa economic research

South Africa / Ppi Electricity Water

Understand the economy

Country Research

South Africa's growth and employment constraints connect the availability of electricity and transport with the ability of firms to invest and workers to reach jobs. The OECD's 2025 survey identifies electricity supply, rail and port bottlenecks, ...

How This Economy Works

Release alerts

Get ZAR Electricity and water PPI alerts

Get the next ZAR Electricity and water PPI release by email. Create a free account or use your existing account to turn on alerts.

Watch a 30-second Short on every major release: subscribe on YouTube

Free account required. Unsubscribe anytime.

Share release X LinkedIn Email

South Africa Electricity and water PPI release chart

Readings leading into this release, with this print highlighted. Hover or tap a point for its value.

South Africa Electricity and water PPI chart through 2025-04-30
ZAR Electricity and water PPI readings through 2025-04-30. Latest: 11.2.

South Africa Electricity and water PPI release analysis

What the release showed

South Africa Electricity and water PPI came in at 11.2 in the release of May 29, 2025, up 1.2 from 10.

How it compares

This is the highest reading in the 3 releases shown since February 2025.

The series rose in 1 and fell in 1 of those release-to-release moves.

Why Electricity and water PPI matters for ZAR

South Africa's Electricity and water PPI is monitored by the South African Reserve Bank when assessing the health of the economy and calibrating monetary policy. Surprises relative to consensus can move the zar in the short term.

How to read it

A reading above market expectations typically signals stronger-than-anticipated conditions and is broadly supportive of the zar. A miss versus consensus can shift rate expectations and weigh on the zar.

What to watch next

  • Direction of change over three to six months
  • Confirmation or contradiction of headline indicators
  • Cross-currency consistency or divergence
  • Revisions to prior prints

Recent South Africa Electricity and water PPI releases

Each release with the date it was published. Full history

Released Period Actual Previous Forecast
May 29, 2025 April 2025 11.2 10 --
Apr 24, 2025 March 2025 10 10.8 --
Mar 27, 2025 February 2025 10.8 10 --
FXMacroData API

Get South Africa Electricity and water PPI data as soon as it is published

This page shows the most recent releases. The API serves the full South Africa Electricity and water PPI history and every other series we cover, with each row stamped with the time the official source published it.

  • Full release history with actual, previous and reference period on every row.
  • Publication timestamps on each announcement, so backtests only use data that was public at the time.
  • Consensus forecasts joined by announcement ID to measure the surprise.
  • Release calendar with confirmed times for upcoming announcements.
  • 22 currencies of central-bank, inflation, jobs, growth and FX data in one schema.
  • REST, Python and MCP for scripts, notebooks and AI assistants.
Individual plan

USD 50/month

14-day free trial. Cancel any time.

Start Free Trial Read the API reference
API endpoint
GET https://api.fxmacrodata.com/v1/announcements/zar/ppi_electricity_water
Python
import requests

resp = requests.get(
    "https://api.fxmacrodata.com/v1/announcements/zar/ppi_electricity_water",
    headers={"X-API-Key": "YOUR_API_KEY"},
    timeout=30,
)
rows = resp.json()["data"]
print(rows[-1])

Match this release by announcement_id zar_ppi_electricity_water_2025-04-30. Forecasts for the same release: /v1/predictions/zar/ppi_electricity_water.

Release data snapshot

Citation fields for this announcement.

Public release ID zar_ppi_electricity_water_2025-05-29
API announcement ID zar_ppi_electricity_water_2025-04-30
Release time
2025-05-29 09:30 UTC
Reference period date 2025-04-30
Actual value 11.2
Previous value 10
Forecast --
Surprise --

More South Africa Electricity and water PPI releases

Move through adjacent announcement records for the same series.

Common questions about this release

The value, its publication time, the next scheduled date, and the official publisher for South Africa Electricity and water PPI.

What did South Africa Electricity and water PPI come in at, and how did it compare with the forecast and the previous reading?

South Africa Electricity and water PPI was 11.2% year on year in April 2025. The previous reading was 10%.

When was this South Africa Electricity and water PPI release published?

This release was published on May 29, 2025 at 11:30 Africa/Johannesburg.

When is the next South Africa Electricity and water PPI release?

The next South Africa Electricity and water PPI date is added here as soon as the publisher confirms its official schedule.

What is the official source for South Africa Electricity and water PPI?

Statistics South Africa publishes the official Electricity and water PPI series. FXMacroData stores every release with its announcement timestamp and serves it from the announcements endpoint for this series. Statistics South Africa official release.

Raw announcement payload

Field names are preserved for traceability and downstream testing.

{
  "announcement_datetime": 1748511000,
  "announcement_id": "zar_ppi_electricity_water_2025-04-30",
  "announcement_source_url": "https://www.statssa.gov.za/publications/P01421/P01421April2025.pdf",
  "capture_time_basis": "backfill_fetch_completed",
  "date": "2025-04-30",
  "observed_at_ns": 1793230201119549100,
  "previous_value": 10.0,
  "publication_time_precision": "minute",
  "publication_time_status": "confirmed",
  "revisions": [],
  "source": "Statistics South Africa",
  "source_contract": {
    "basis": "catalogue",
    "frequency": "Monthly",
    "source_series_id": "STATSSA:P01421:TableA:PPI_ELECTRICITY_WATER:YOY",
    "unit": "%YoY"
  },
  "source_url": "https://www.statssa.gov.za/publications/P01421/P01421April2025.pdf",
  "source_url_scope": "dataset",
  "source_vintage": "2025-04-30",
  "val": 11.2,
  "vintage_status": "captured_snapshot"
}